VINYL LINER POOL INSTALLATION PROCESS.


1. Vinyl Liner Pool Layout Meeting

Before the excavator is moved on site, we will have a site meeting to finalize the size and location of the in ground  Vinyl liner swimming pool and filter equipment.

2. In ground vinyl liner Swimming Pool Excavation

The excavation crew will arrive on site to dig the vinyl liner swimming pool.  The first day we will start the excavation to get ready for the steel wall panels.

3. Pool Wall Panel Assembly

The wall crew will arrive and set up the steel wall panels. They will then level the vinyl liner pool using a laser transit to ensure the vinyl liner swimming is perfectly level in the yard. We will pour a concrete collar around the perimeter of the in ground  pool , pour the shallow end floor and the deep end pad. We will need power and water available at this phase of construction.

4. Plumbing Rough-In

Our plumbing crew will arrive and install whatever piping is necessary per your contract specifications, depending on the site conditions. The pipes may be extended to the filter location or they may be stubbed off at the swimming  pool’s edge to be extended at a later date. The piping will be pressurized with either water or air and will remain so throughout the swimming pool construction process.

5. Grading

After the concrete process and initial plumbing is complete, we will rough grade the site with existing fill. If additional fill is needed, we would like to have it delivered at this time while our machine is on site. After the site has been graded it is time for the electrician to begin the electrical work.

6. Hard Bottom

Strong Pool Krete is made up of Portland cement, vermiculite, and sand. When all three are combined and troweled out, you get a strong smooth surface for your liner to lay on. Pool Krete will setup and turn into a hard “cork board” for your liner.

7.  In Ground Vinyl Liner Installation

After the hard bottom is cured we will install your liner. We will install a foam wall pad around the wall perimeter and over the shallow end floor to give a cushioned feel to the pool and to protect the liner against any imperfections in the floor. We will install special vacuums to remove any air from behind the liner, this will ensure a perfect fit.

8. Vinyl Liner Pool Start-Up

When your Vinyl liner swimming pool is filled to the middle of the skimmer and the electrician has completed wiring the filtration system, we ask that you call our office to set up a time when we can meet you and give you instructions on swimming pool care and maintenance. At this time we will deliver any accessories that are included in your pool contract.

9. Follow Up

The follow-up crew is made of technicians from the service department who are trained in all aspects of Vinyl liner swimming pool construction, operation and especially maintenance. They will provide written materials and booklets on pool care. 

Digging vinyl liner pool in Oakland County Michigan
Liner install in Commerce 48382
 

Vinyl Liner Pools

 
Vinyl liner swimming pool in Ann Arbor Michigan
Commerce Michigan,  in ground pool installation
   
 © 2008 - 2017   ARTISTIC DEVELOPMENT L.L.C by AccuNet Web Services